What is a mitigated Fonsi?

The FONSI may be a mitigated FONSI in which case the required mitigation factors should be listed in the FONSI. The use of a mitigated FONSI is conditioned upon the implementation of the identified mitigation measures in the EA that support the FONSI.

Can mitigation be used to justify a Fonsi?

* This use of mitigation may allow the agency to comply with NEPA’s procedural requirements by issuing an EA and a Finding of No Significant Impact (FONSI), or “mitigated FONSI,” based on the agency’s commitment to ensure the mitigation that supports the FONSI is performed, thereby avoiding the need to prepare an EIS.

What are the mitigating measures?

Mitigation Measures means measures to eliminate, reduce, control or offset the adverse effects of a project or designated project, and include restitution for any damage caused by those effects through replacement, restoration, compensation or any other means.

Does NEPA require mitigation measures be implemented?

While NEPA requires consideration of mitigation, it does not mandate the form or adoption of any mitigation. Mitigation includes: (1) Avoiding the impact altogether by not taking a certain action or parts of an action. (2) Minimizing impacts by limiting the degree or magnitude of the action and its implementation.

Who prepares a Fonsi?

FTA Regional staff is responsible for overseeing the development of a FONSI and ensuring that the document meets all regulatory and statutory environmental requirements. 4.1. Review public record.

What is Finding of No Significant Impact?

Finding of no significant impact means a document by a Federal agency briefly presenting the reasons why an action, not otherwise excluded (§ 1508.4), will not have a significant effect on the human environment and for which an environmental impact statement therefore will not be prepared.

What are some examples of mitigation?

Examples of mitigation actions are planning and zoning, floodplain protection, property acquisition and relocation, or public outreach projects. Examples of preparedness actions are installing disaster warning systems, purchasing radio communications equipment, or conducting emergency response training.

Is FERC subject to NEPA?

In its NEPA documents, FERC will indicate that it has considered all comments on the draft document. However, FERC will provide responses to substantive issues raised and avoid the use of phrases such as “comment noted” or “no response needed” in the NEPA document.

What is an environmental mitigation plan?

Environmental Mitigation Plan means the plan of actions to be undertaken by the Borrower to mitigate potential negative environmental consequences of the Project, adopted by the Ministry of Environmental Protection and Physical Planning on February 2, 2003, as the same may be amended from time to time; Sample 1Sample 2.

What is a Fonsi NEPA?

A FONSI is a document that presents the reasons why the agency has concluded that there are no significant environmental impacts projected to occur upon implementation of the action.

How do you mitigate risk examples?

Five risk mitigation strategies with examples

  1. Assume and accept risk.
  2. Avoidance of risk.
  3. Controlling risk.
  4. Transference of risk.
  5. Watch and monitor risk.

What is risk mitigation give an example?

Risk mitigation revolves around reducing the impact of potential risk. A jewelry store might mitigate the risk of theft, by having a security system or even a security guard at the entrance.

Does NEPA apply to independent agencies?

Section 102 of NEPA makes it clear that the law applies to “all agencies of the Federal Government.” Therefore, NEPA does not make any distinction between independent and Page 4 3 executive agencies.

What is covered in an environmental impact statement?

An EIS outlines the status of the environment in the affected area, provides a baseline for understanding the potential consequences of the proposed project, identifies positive and negative effects for the environment, and offers alternative actions, including inaction, in relation to the proposed project.

How do you write an environmental impact statement?

Some key components of the EIS are described below:

  1. Summary. The summary presents an overview of the contents of the EIS and a comparison of impacts expected for the proposal and alternatives.
  2. Purpose and Need.
  3. Proposed Action and Alternatives.
  4. Affected Environment.
  5. Expected Impacts.
  6. Consultation and Coordination.
  7. Appendices.

What is mitigation with example?

Examples of mitigation strategies include: hazard specific control activities such as flood levees or bushfire mitigation strategies. design improvements to infrastructure or services. land use planning and design decisions that avoid developments and community infrastructure in areas prone to hazards.

Previous post Do exterior walls need to be fire rated?
Next post What does sociological focus mean?