How much does it cost to build a major airport?
To build an airport costs USD 30 million per 3 km runaway, as well as USD 500 per square meter (SQM) for an airport passenger terminal.
How much did it cost to build the SLC airport?
$4.1 billion
Construction personnel worked more than 8.5 million hours. The New SLC Airport cost $4.1 billion to construct; but not a single dollar came from local (Utah) taxes. The New SLC Airport’s footprint stretches 296.7 acres. Airport workers installed 7,600 stone columns, guaranteeing seismic stability.

How much did it cost to build Miami International Airport?
Miami International Airport is nearing completion of its $2.94 billion transformation of Concourses A through D into the new North Terminal.
How much did it cost to build the Tampa airport?
Tampa International Airport was clearly ahead of its time, said Paras. And the $85-million price tag to build it wasn’t considered cheap. Carrying out such a project took the teamwork of some radical thinkers combined with the full support of the community and its city leaders.
How much does a runway expansion cost?
o Seal joint between old and new bituminous The resulting estimated unit price for widening of a runway is $33 per square yard.

How much did it cost to build Dubai airport?
The concourse opened on 2 January 2013 and was built at a cost of US$3.3 billion.
How much did the SLC airport cost?
The price tag for The New SLC Airport is $4.1 billion and includes no local taxpayer dollars. For years, SLC was the only large-size, hub airport in the country to be debt free.
Why do Airports cost so much to build?
Building a runway is even more complex than building a major highway/motorway, which has similar demands in terms of the need for an extremely well engineered surface, high levels of quality control in the materials used, and superior drainage.
Who owns Miami Airport?
the Miami-Dade Aviation Department
Miami International Airport (MIA), located on 3,230 acres of land near downtown Miami, is operated by the Miami-Dade Aviation Department and is the property of Miami-Dade County government.
How long did it take to build Tampa Airport?
The new Tampa International: A revolutionary concept. RE-IMAGINING THE AIRPORT EXPERIENCE: An 18-month study resulted in the revolutionary Landside/Airside concept that put an emphasis on passenger comfort, right-size facility planning for future and current operations, and maximizing revenues.
How much does it cost to pave a runway?
The construction of a 20- 30m-width concrete-based runway is estimated to cost between US$ 4,400 and 7,200 per linear metre, whereas using asphalt the cost is about $3,900 per linear metre.
Why do airport runways cost so much?
How much does the Dubai Airport cost?
Who owns Dubai airports?
Under Sheikh Ahmed’s leadership, the DCA underwent an organisational restructuring in April 2007 resulting in the creation of the Dubai Civil Aviation Authority (DCAA) as the local regulatory body, and Dubai Airports as the owner and operator of Dubai’s airports – Dubai International and Dubai World Central.
Who paid for new SLC Airport?
The Salt Lake City Department of Airports is an enterprise fund of Salt lake City Corporation, which means the airport is financially self-sustaining. The City’s general fund revenues does not support the Airport’s operation. No local tax dollars are being spent on The New SLC. Economic impact – $5.5 billion.
How much does a new runway cost?
paved runway will cost anywhere between $2-$3 million to build. That cost does not include permits and fees for creating a paved structure, which could be another 3%-5% of the project cost.